As of most recent estimates, the cost of a BESS by MW is between $200,000 and $450,000, varying by location, system size, and market conditions.
The 100 MW/200 MWh battery energy storage system (BESS) is connected to the grid with a charge and discharge voltage of 63 kV. It is expected to be fully operational by the end of 2025.